{"id":454,"date":"2026-11-05T22:19:56","date_gmt":"2026-11-05T22:19:56","guid":{"rendered":"https:\/\/blog.indiafortomorrow.com\/library\/0371\/"},"modified":"2026-11-05T22:19:56","modified_gmt":"2026-11-05T22:19:56","slug":"0371","status":"publish","type":"page","link":"https:\/\/blog.indiafortomorrow.com\/library\/0371\/","title":{"rendered":"MICROGRIDS"},"content":{"rendered":"<p><main id=\"main\"><\/p>\n<nav aria-label=\"Breadcrumb\" class=\"breadcrumbs\"><a href=\"\/\">Home<\/a><a href=\"\/library\/\">Topic library<\/a><span aria-current=\"page\">MICROGRIDS<\/span><\/nav>\n<section class=\"section source-head\"><a class=\"text-link\" href=\"\/library\/?family=energy-security\">\u2190 Energy Security library<\/a><\/p>\n<div class=\"eyebrow\">From the IFT source library<\/div>\n<h1>MICROGRIDS<\/h1>\n<p class=\"note\">Topic-specific explanations and research proposals developed from IFT source content. Local evidence, permissions, costs and results remain to be established.<\/p>\n<p><a class=\"text-link\" href=\"https:\/\/reimagine.indiafortomorrow.com\/energy-security\/microgrids\/\" rel=\"noopener\" target=\"_blank\">Original source \u2197<\/a><\/section>\n<div class=\"reader-layout organised-reader\">\n<nav aria-label=\"On this page\" class=\"inside-toc\">\n<h2>On this page<\/h2>\n<p><a href=\"#editorial-explanation\">Understand this topic<\/a><a href=\"#evidence-snapshot\">Evidence Snapshot<\/a><a href=\"#editorial-ideas\">10 practical ideas<\/a><a href=\"#editorial-faq\">15 questions and answers<\/a><\/nav>\n<article class=\"source-copy\"><span aria-hidden=\"true\" class=\"legacy-anchor\" id=\"reading-section-01\"><\/span><span aria-hidden=\"true\" class=\"legacy-anchor\" id=\"reading-section-02\"><\/span><span aria-hidden=\"true\" class=\"legacy-anchor\" id=\"reading-section-03\"><\/span><span aria-hidden=\"true\" class=\"legacy-anchor\" id=\"reading-section-04\"><\/span><span aria-hidden=\"true\" class=\"legacy-anchor\" id=\"reading-section-05\"><\/span><span aria-hidden=\"true\" class=\"legacy-anchor\" id=\"reading-section-06\"><\/span><span aria-hidden=\"true\" class=\"legacy-anchor\" id=\"reading-section-07\"><\/span><span aria-hidden=\"true\" class=\"legacy-anchor\" id=\"reading-section-08\"><\/span><span aria-hidden=\"true\" class=\"legacy-anchor\" id=\"reading-section-09\"><\/span><span aria-hidden=\"true\" class=\"legacy-anchor\" id=\"topic-section-1\"><\/span><span aria-hidden=\"true\" class=\"legacy-anchor\" id=\"topic-section-10\"><\/span><span aria-hidden=\"true\" class=\"legacy-anchor\" id=\"topic-section-11\"><\/span><span aria-hidden=\"true\" class=\"legacy-anchor\" id=\"topic-section-12\"><\/span><span aria-hidden=\"true\" class=\"legacy-anchor\" id=\"topic-section-13\"><\/span><span aria-hidden=\"true\" class=\"legacy-anchor\" id=\"topic-section-14\"><\/span><span aria-hidden=\"true\" class=\"legacy-anchor\" id=\"topic-section-15\"><\/span><span aria-hidden=\"true\" class=\"legacy-anchor\" id=\"topic-section-16\"><\/span><span aria-hidden=\"true\" class=\"legacy-anchor\" id=\"topic-section-17\"><\/span><span aria-hidden=\"true\" class=\"legacy-anchor\" id=\"topic-section-18\"><\/span><span aria-hidden=\"true\" class=\"legacy-anchor\" id=\"topic-section-19\"><\/span><span aria-hidden=\"true\" class=\"legacy-anchor\" id=\"topic-section-2\"><\/span><span aria-hidden=\"true\" class=\"legacy-anchor\" id=\"topic-section-20\"><\/span><span aria-hidden=\"true\" class=\"legacy-anchor\" id=\"topic-section-21\"><\/span><span aria-hidden=\"true\" class=\"legacy-anchor\" id=\"topic-section-22\"><\/span><span aria-hidden=\"true\" class=\"legacy-anchor\" id=\"topic-section-23\"><\/span><span aria-hidden=\"true\" class=\"legacy-anchor\" id=\"topic-section-24\"><\/span><span aria-hidden=\"true\" class=\"legacy-anchor\" id=\"topic-section-25\"><\/span><span aria-hidden=\"true\" class=\"legacy-anchor\" id=\"topic-section-26\"><\/span><span aria-hidden=\"true\" class=\"legacy-anchor\" id=\"topic-section-27\"><\/span><span aria-hidden=\"true\" class=\"legacy-anchor\" id=\"topic-section-28\"><\/span><span aria-hidden=\"true\" class=\"legacy-anchor\" id=\"topic-section-29\"><\/span><span aria-hidden=\"true\" class=\"legacy-anchor\" id=\"topic-section-3\"><\/span><span aria-hidden=\"true\" class=\"legacy-anchor\" id=\"topic-section-30\"><\/span><span aria-hidden=\"true\" class=\"legacy-anchor\" id=\"topic-section-4\"><\/span><span aria-hidden=\"true\" class=\"legacy-anchor\" id=\"topic-section-5\"><\/span><span aria-hidden=\"true\" class=\"legacy-anchor\" id=\"topic-section-6\"><\/span><span aria-hidden=\"true\" class=\"legacy-anchor\" id=\"topic-section-7\"><\/span><span aria-hidden=\"true\" class=\"legacy-anchor\" id=\"topic-section-8\"><\/span><span aria-hidden=\"true\" class=\"legacy-anchor\" id=\"topic-section-9\"><\/span><\/p>\n<section class=\"editorial-introduction\" id=\"editorial-explanation\">\n<p class=\"eyebrow\">Understand the topic<\/p>\n<h2>What this means in daily life<\/h2>\n<p>A microgrid brings local electricity sources and connected loads under coordinated operation. Some designs can run while separated from the wider grid, but that capability must be designed, authorised and tested. A collection of solar panels and batteries is not automatically a safe microgrid.<\/p>\n<p>The IFT source proposes studying microgrids for essential facilities and remote communities. Start with the service that needs protection, the actual demand and the local operating team. Compare a microgrid with simpler alternatives, including repairing an unreliable connection or reducing demand. The proposal below is a research pathway, not a recommendation to disconnect from the grid.<\/p>\n<\/section>\n<section class=\"evidence-snapshot\" data-evidence-version=\"2026-11-05\" id=\"evidence-snapshot\">\n<p class=\"eyebrow\">Data reference table<\/p>\n<h2 id=\"evidence-snapshot-heading\">Evidence Snapshot<\/h2>\n<p>Read each value with its reporting period, population and limitations. A historical national reference is not a local baseline or proof that an IFT proposal works.<\/p>\n<p class=\"evidence-status\">5 measurement records still need data and a review of their relevance.<\/p>\n<div aria-labelledby=\"evidence-snapshot-heading\" class=\"evidence-scroll\" role=\"region\" tabindex=\"0\">\n<table class=\"evidence-table\">\n<caption>Data references for MICROGRIDS<\/caption>\n<thead>\n<tr>\n<th scope=\"col\">Signal<\/th>\n<th scope=\"col\">Reference Value<\/th>\n<th scope=\"col\">Period \/ Population<\/th>\n<th scope=\"col\">How to Read It<\/th>\n<th scope=\"col\">Source Status<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr class=\"data-required-record\" data-evidence-record=\"need-371-1\">\n<th scope=\"row\">Outage frequency and duration<\/th>\n<td>\n<p>Not established<\/p>\n<p class=\"evidence-small\">Data required \u2014 not zero<\/p>\n<\/td>\n<td>\n<p>Reporting period: Information Required<\/p>\n<p>Population and geography: Information Required<\/p>\n<\/td>\n<td>\n<p>Proposed measure; no observed value is established here.<\/p>\n<p>Limitations: Define the measure, unit, reporting period and covered population; obtain a traceable dataset and review its suitability for this topic before using a number.<\/p>\n<\/td>\n<td>\n<p>Source organisation: Information Required<\/p>\n<p>Direct source URL: not yet verified<\/p>\n<p>Source publication date: not established<\/p>\n<p class=\"evidence-verification\">Verification status: Data required<\/p>\n<\/td>\n<\/tr>\n<tr class=\"data-required-record\" data-evidence-record=\"need-371-2\">\n<th scope=\"row\">Voltage and service quality<\/th>\n<td>\n<p>Not established<\/p>\n<p class=\"evidence-small\">Data required \u2014 not zero<\/p>\n<\/td>\n<td>\n<p>Reporting period: Information Required<\/p>\n<p>Population and geography: Information Required<\/p>\n<\/td>\n<td>\n<p>Proposed measure; no observed value is established here.<\/p>\n<p>Limitations: Define the measure, unit, reporting period and covered population; obtain a traceable dataset and review its suitability for this topic before using a number.<\/p>\n<\/td>\n<td>\n<p>Source organisation: Information Required<\/p>\n<p>Direct source URL: not yet verified<\/p>\n<p>Source publication date: not established<\/p>\n<p class=\"evidence-verification\">Verification status: Data required<\/p>\n<\/td>\n<\/tr>\n<tr class=\"data-required-record\" data-evidence-record=\"need-371-3\">\n<th scope=\"row\">Affordability and access<\/th>\n<td>\n<p>Not established<\/p>\n<p class=\"evidence-small\">Data required \u2014 not zero<\/p>\n<\/td>\n<td>\n<p>Reporting period: Information Required<\/p>\n<p>Population and geography: Information Required<\/p>\n<\/td>\n<td>\n<p>Proposed measure; no observed value is established here.<\/p>\n<p>Limitations: Define the measure, unit, reporting period and covered population; obtain a traceable dataset and review its suitability for this topic before using a number.<\/p>\n<\/td>\n<td>\n<p>Source organisation: Information Required<\/p>\n<p>Direct source URL: not yet verified<\/p>\n<p>Source publication date: not established<\/p>\n<p class=\"evidence-verification\">Verification status: Data required<\/p>\n<\/td>\n<\/tr>\n<tr class=\"data-required-record\" data-evidence-record=\"need-371-4\">\n<th scope=\"row\">Storage and backup coverage<\/th>\n<td>\n<p>Not established<\/p>\n<p class=\"evidence-small\">Data required \u2014 not zero<\/p>\n<\/td>\n<td>\n<p>Reporting period: Information Required<\/p>\n<p>Population and geography: Information Required<\/p>\n<\/td>\n<td>\n<p>Proposed measure; no observed value is established here.<\/p>\n<p>Limitations: Define the measure, unit, reporting period and covered population; obtain a traceable dataset and review its suitability for this topic before using a number.<\/p>\n<\/td>\n<td>\n<p>Source organisation: Information Required<\/p>\n<p>Direct source URL: not yet verified<\/p>\n<p>Source publication date: not established<\/p>\n<p class=\"evidence-verification\">Verification status: Data required<\/p>\n<\/td>\n<\/tr>\n<tr class=\"data-required-record\" data-evidence-record=\"need-371-5\">\n<th scope=\"row\">Restoration and resilience<\/th>\n<td>\n<p>Not established<\/p>\n<p class=\"evidence-small\">Data required \u2014 not zero<\/p>\n<\/td>\n<td>\n<p>Reporting period: Information Required<\/p>\n<p>Population and geography: Information Required<\/p>\n<\/td>\n<td>\n<p>Proposed measure; no observed value is established here.<\/p>\n<p>Limitations: Define the measure, unit, reporting period and covered population; obtain a traceable dataset and review its suitability for this topic before using a number.<\/p>\n<\/td>\n<td>\n<p>Source organisation: Information Required<\/p>\n<p>Direct source URL: not yet verified<\/p>\n<p>Source publication date: not established<\/p>\n<p class=\"evidence-verification\">Verification status: Data required<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>Different surveys, administrative records, estimates and reporting years are not interchangeable. No combined IFT score is calculated from these rows.<\/p>\n<p class=\"evidence-audit-link\"><a href=\"\/downloads\/evidence-audit.csv\">Evidence coverage and review log (CSV)<\/a> \u00b7 <a href=\"\/assets\/evidence-register.json\">Structured evidence register (JSON)<\/a><\/p>\n<\/section>\n<section id=\"editorial-ideas\">\n<p class=\"eyebrow\">10 ideas for this topic<\/p>\n<h2>What could be done \u2014 and what needs testing<\/h2>\n<p>These are proposals for research and local testing. They are not claims that a project has been funded, implemented or proved successful.<\/p>\n<div class=\"topic-ideas-list\">\n<article class=\"topic-idea\"><span class=\"idea-number\">Idea 01<\/span><\/p>\n<h3>Choose one clearly bounded service<\/h3>\n<p>Select an authorised facility or community with a documented electricity problem. Define which users and loads are inside the proposed study and which remain outside it.<\/p>\n<p><span class=\"check-label\">What to check: <\/span>Agree ownership and do not imply that all local services will be protected.<\/p>\n<\/article>\n<article class=\"topic-idea\"><span class=\"idea-number\">Idea 02<\/span><\/p>\n<h3>Measure demand before choosing equipment<\/h3>\n<p>Study normal, peak and essential demand over a suitable period. Include seasonal changes and the equipment that users realistically expect to add.<\/p>\n<p><span class=\"check-label\">What to check: <\/span>Explain missing data and avoid sizing a system from a single convenient day.<\/p>\n<\/article>\n<article class=\"topic-idea\"><span class=\"idea-number\">Idea 03<\/span><\/p>\n<h3>Compare repair with a new microgrid<\/h3>\n<p>Ask whether feeder repairs, maintenance, efficiency or another supply arrangement could solve the problem with less complexity. Cost the credible alternatives before selecting a technology.<\/p>\n<p><span class=\"check-label\">What to check: <\/span>Use comparable reliability requirements and costs over the full life of the system.<\/p>\n<\/article>\n<article class=\"topic-idea\"><span class=\"idea-number\">Idea 04<\/span><\/p>\n<h3>Study permitted grid interaction<\/h3>\n<p>Have qualified teams and the relevant utility assess the intended connection, protection and operating arrangements. Explain whether independent operation is an approved project requirement.<\/p>\n<p><span class=\"check-label\">What to check: <\/span>Do not publish or carry out DIY switching instructions.<\/p>\n<\/article>\n<article class=\"topic-idea\"><span class=\"idea-number\">Idea 05<\/span><\/p>\n<h3>Match storage to the actual service gap<\/h3>\n<p>Compare whether the project needs short interruption support, longer energy delivery or another function. Evaluate alternatives against that defined task instead of battery capacity alone.<\/p>\n<p><span class=\"check-label\">What to check: <\/span>Review safety, replacement, maintenance, environment and supply-chain dependencies.<\/p>\n<\/article>\n<article class=\"topic-idea\"><span class=\"idea-number\">Idea 06<\/span><\/p>\n<h3>Agree fair user service rules<\/h3>\n<p>If multiple users are involved, discuss connection terms, service priorities, payment, complaints and what happens during shortages before construction.<\/p>\n<p><span class=\"check-label\">What to check: <\/span>Check impacts on low-income households and people with essential access needs.<\/p>\n<\/article>\n<article class=\"topic-idea\"><span class=\"idea-number\">Idea 07<\/span><\/p>\n<h3>Train a local operating team<\/h3>\n<p>Identify which tasks can be done locally and which require specialists. Arrange training, supervision, spare parts and a reliable support contact before handover.<\/p>\n<p><span class=\"check-label\">What to check: <\/span>Attendance at training does not establish competence or safe authorisation.<\/p>\n<\/article>\n<article class=\"topic-idea\"><span class=\"idea-number\">Idea 08<\/span><\/p>\n<h3>Plan for equipment and connectivity failure<\/h3>\n<p>Ask the designer to explain how the system responds to failed components or lost communication. Test approved fallback procedures with the operator.<\/p>\n<p><span class=\"check-label\">What to check: <\/span>Fallback must preserve electrical safety rather than bypass protective controls.<\/p>\n<\/article>\n<article class=\"topic-idea\"><span class=\"idea-number\">Idea 09<\/span><\/p>\n<h3>Record actual service and cost<\/h3>\n<p>Compare delivered service, interruption patterns, usable energy, complaints, maintenance and bills during the pilot. Keep estimated savings separate from measured results.<\/p>\n<p><span class=\"check-label\">What to check: <\/span>Include costs borne by households or the host institution.<\/p>\n<\/article>\n<article class=\"topic-idea\"><span class=\"idea-number\">Idea 10<\/span><\/p>\n<h3>Agree replacement and eventual closure<\/h3>\n<p>Document who owns the assets, funds replacements and handles obsolete equipment. Include the option to modify or end the project if a stronger supply alternative becomes available.<\/p>\n<p><span class=\"check-label\">What to check: <\/span>Prevent abandoned assets or unexpected liabilities for the community.<\/p>\n<\/article>\n<\/div>\n<\/section>\n<section class=\"reading-section\" id=\"editorial-references\">\n<h2>References and evidence limits<\/h2>\n<ul>\n<li><a href=\"https:\/\/www.energy.gov\/cmei\/femp\/articles\/islanding-microgrid\" rel=\"noopener\" target=\"_blank\">US Department of Energy: Islanding a Microgrid<\/a>\n<p>Explains coordinated microgrid operation and grid-connected versus islanded operation. It does not approve an Indian project or establish local permissions.<\/p>\n<\/li>\n<li><a href=\"https:\/\/www.energy.gov\/oe\/microgrid-systems\" rel=\"noopener\" target=\"_blank\">US Department of Energy: Microgrid Systems<\/a>\n<p>Technical background on clearly defined electrical boundaries and coordinated local resources; project engineering and utility approval remain required.<\/p>\n<\/li>\n<\/ul>\n<p>Reference guidance informs the proposal. It does not establish local conditions, approve a design or prove that these proposed projects work.<\/p>\n<\/section>\n<\/article>\n<aside><span class=\"eyebrow\">CONTINUE EXPLORING<\/span><a class=\"reading-link\" href=\"\/library\/0372\/\">MSME ENERGY SYSTEM \u2197<\/a><a class=\"reading-link\" href=\"\/library\/0373\/\">MUNICIPAL ENERGY SYSTEM \u2197<\/a><a class=\"reading-link\" href=\"\/library\/0374\/\">National Intelligence, Access &amp; Grid \u2197<\/a><a class=\"reading-link\" href=\"\/library\/0300\/\">24\u00d77 RELIABLE ELECTRICITY \u2197<\/a><a class=\"reading-link\" href=\"\/blog\/\">Ideas &amp; articles \u2197<\/a><a class=\"reading-link\" href=\"\/participate\/\">Contribute or correct a source \u2197<\/a><\/aside>\n<\/div>\n<section class=\"section page-faq\" id=\"editorial-faq\">\n<p class=\"eyebrow\">15 questions, answered clearly<\/p>\n<h2>Questions about MICROGRIDS<\/h2>\n<details>\n<summary>What is a microgrid in simple language?<\/summary>\n<p>It is a local electricity system whose sources and loads operate together. Depending on its approved design, it may be connected to the main grid or able to operate separately. Its boundaries, controls and responsibilities must be clear.<\/p>\n<\/details>\n<details>\n<summary>Is every rooftop solar installation a microgrid?<\/summary>\n<p>No. Solar generation alone does not establish coordinated local operation or safe independent operation during a grid outage. Ask the qualified designer which functions the actual system is designed and authorised to provide.<\/p>\n<\/details>\n<details>\n<summary>When is a microgrid worth studying?<\/summary>\n<p>It may be worth studying where an essential service or community has a defined electricity problem and an accountable operator. That is a starting question, not proof that a microgrid is better than connection repairs or another option.<\/p>\n<\/details>\n<details>\n<summary>Can a microgrid guarantee electricity all day and night?<\/summary>\n<p>No guarantee follows from the label. Supply depends on design, demand, resources, equipment condition and operating arrangements. A study should state the service requirement, test credible disruption scenarios and explain any remaining limits.<\/p>\n<\/details>\n<details>\n<summary>Why measure household or facility demand first?<\/summary>\n<p>The system must serve real needs, including peaks and seasonal changes. Equipment selected without adequate demand evidence may provide too little service or impose avoidable cost. Future demand assumptions should be visible and reviewed.<\/p>\n<\/details>\n<details>\n<summary>Can a community build and connect the system itself?<\/summary>\n<p>Electrical design, installation, connection and operation require appropriate professional competence and permissions. Community participation is important for needs and governance, but it is not a substitute for safe engineering or utility approval.<\/p>\n<\/details>\n<details>\n<summary>Who should own a community microgrid?<\/summary>\n<p>There is no single answer. The agreed arrangement must specify asset ownership, operator duties, payments, maintenance, complaints, replacement and closure. Residents need a clear explanation before accepting long-term obligations.<\/p>\n<\/details>\n<details>\n<summary>Are batteries always necessary?<\/summary>\n<p>No universal equipment list is proposed. The need for storage depends on the intended service, sources, demand and operating requirements. Compare technically sound alternatives and their lifetime responsibilities with qualified specialists.<\/p>\n<\/details>\n<details>\n<summary>How should the project show benefits?<\/summary>\n<p>Report actual service continuity, usable energy, affordability, maintenance and user experience against a suitable baseline. Explain subsidies and costs. A forecast made before installation is not evidence that households received the promised benefit.<\/p>\n<\/details>\n<details>\n<summary>What is still required before an IFT microgrid pilot?<\/summary>\n<p>A selected site, service requirement, demand evidence, operator, utility involvement, engineering assessment, permissions, finance and evaluation plan remain required. No operating microgrid or partnership is being claimed on this page.<\/p>\n<\/details>\n<details>\n<summary>What would the \u201cAgree fair user service rules\u201d idea involve?<\/summary>\n<p>If multiple users are involved, discuss connection terms, service priorities, payment, complaints and what happens during shortages before construction. What to check: Check impacts on low-income households and people with essential access needs.<\/p>\n<\/details>\n<details>\n<summary>What would the \u201cTrain a local operating team\u201d idea involve?<\/summary>\n<p>Identify which tasks can be done locally and which require specialists. Arrange training, supervision, spare parts and a reliable support contact before handover. What to check: Attendance at training does not establish competence or safe authorisation.<\/p>\n<\/details>\n<details>\n<summary>What would the \u201cPlan for equipment and connectivity failure\u201d idea involve?<\/summary>\n<p>Ask the designer to explain how the system responds to failed components or lost communication. Test approved fallback procedures with the operator. What to check: Fallback must preserve electrical safety rather than bypass protective controls.<\/p>\n<\/details>\n<details>\n<summary>What would the \u201cRecord actual service and cost\u201d idea involve?<\/summary>\n<p>Compare delivered service, interruption patterns, usable energy, complaints, maintenance and bills during the pilot. Keep estimated savings separate from measured results. What to check: Include costs borne by households or the host institution.<\/p>\n<\/details>\n<details>\n<summary>What would the \u201cAgree replacement and eventual closure\u201d idea involve?<\/summary>\n<p>Document who owns the assets, funds replacements and handles obsolete equipment. Include the option to modify or end the project if a stronger supply alternative becomes available. What to check: Prevent abandoned assets or unexpected liabilities for the community.<\/p>\n<\/details>\n<\/section>\n<p><\/main><\/p>\n","protected":false},"excerpt":{"rendered":"<p>HomeTopic libraryMICROGRIDS \u2190 Energy Security library From the IFT source library MICROGRIDS Topic-specific explanations and research proposals developed from IFT source content. Local evidence, permissions, costs and results remain to be established. Original source \u2197 On this page Understand this topicEvidence Snapshot10 practical ideas15 questions and answers Understand the topic What this means in daily [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":84,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"ift_pillar":[],"class_list":["post-454","page","type-page","status-publish","hentry"],"_hostinger_reach_plugin_has_subscription_block":false,"_hostinger_reach_plugin_is_elementor":false,"_links":{"self":[{"href":"https:\/\/blog.indiafortomorrow.com\/wp-json\/wp\/v2\/pages\/454","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blog.indiafortomorrow.com\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/blog.indiafortomorrow.com\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/blog.indiafortomorrow.com\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/blog.indiafortomorrow.com\/wp-json\/wp\/v2\/comments?post=454"}],"version-history":[{"count":0,"href":"https:\/\/blog.indiafortomorrow.com\/wp-json\/wp\/v2\/pages\/454\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/blog.indiafortomorrow.com\/wp-json\/wp\/v2\/pages\/84"}],"wp:attachment":[{"href":"https:\/\/blog.indiafortomorrow.com\/wp-json\/wp\/v2\/media?parent=454"}],"wp:term":[{"taxonomy":"ift_pillar","embeddable":true,"href":"https:\/\/blog.indiafortomorrow.com\/wp-json\/wp\/v2\/ift_pillar?post=454"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}