Explore IndiaCurrent IndiaTomorrow IndiaSearchReport a problem
India For Tomorrow
[translera_switcher]
National priority 10 · Cities, Housing & Infrastructure

Cities, Housing & Infrastructure

Liveable settlements with safe housing, accessible services and infrastructure that lasts.

Neighbourhoods that function every day.

Connect housing, utilities, public space, accessibility and maintenance. Start with the people who use a place and the services they need. Compare full-life cost, land and environmental effects, displacement risks and long-term responsibilities.

Question 1

Can residents reach work, schools, care and essential services safely?

Question 2

Do utilities and maintenance work together instead of creating repeated disruption?

Question 3

Will the proposed improvement remain affordable and usable?

Data reference table

Evidence Snapshot

Read each value with its reporting period, population and limitations. A historical national reference is not a local baseline or proof that an IFT proposal works.

12 source-linked reference records. Publication checks do not independently reproduce the underlying data.

Data references for Cities, Housing & Infrastructure
SignalReference ValuePeriod / PopulationHow to Read ItSource Status
Pedestrians killed in reported road crashes

35,221 people

Historical reference

Calendar 2023

India; pedestrian casualties in Table 4.4

Pedestrian fatalities require separate attention.

Limitations: Police-reported count; not adjusted for walking exposure or a particular street.

Ministry of Road Transport and Highways

Official government report

Road Accidents in India 2023

Published: Not stated on the retrieved publication

Publication checked: 2026-11-04

Value, period and coverage checked in publication

Cyclists killed in reported road crashes

4,560 people

Historical reference

Calendar 2023

India; bicycle users in Table 4.4

Bicycle-user fatalities are distinct from motorised two-wheelers.

Limitations: Police-reported count; no cycling-distance denominator or inference about a specific cycle lane.

Ministry of Road Transport and Highways

Official government report

Road Accidents in India 2023

Published: Not stated on the retrieved publication

Publication checked: 2026-11-04

Value, period and coverage checked in publication

PMAY-U homes sanctioned

118.64 lakh homes

Historical reference

Cumulative as at 22 July 2024

India; PMAY-U programme houses

Approved programme stock; not completed homes.

Limitations: Scheme counts do not measure all housing need, total living cost, construction quality or secure occupancy.

Ministry of Housing and Urban Affairs / PIB

Official government release

Houses constructed and allotted for the poor in urban areas

Published: 2024-08-01

Publication checked: 2026-11-04

Value, period and coverage checked in publication

PMAY-U homes grounded for construction

114.33 lakh homes

Historical reference

Cumulative as at 22 July 2024

India; PMAY-U programme houses

Construction-start stage; not occupancy.

Limitations: Scheme counts do not measure all housing need, total living cost, construction quality or secure occupancy. The source Annexure also includes 4.01 lakh JnNURM houses grounded during the mission period; this total is not exclusively newly sanctioned PMAY-U construction.

Ministry of Housing and Urban Affairs / PIB

Official government release

Houses constructed and allotted for the poor in urban areas

Published: 2024-08-01

Publication checked: 2026-11-04

Value, period and coverage checked in publication

PMAY-U homes completed or delivered

85.04 lakh homes

Historical reference

Cumulative as at 22 July 2024

India; PMAY-U programme houses

Administrative completion/delivery stock.

Limitations: Scheme counts do not measure all housing need, total living cost, construction quality or secure occupancy. The source Annexure also includes 3.41 lakh JnNURM houses completed during the mission period; completion/delivery and occupied homes are separate columns.

Ministry of Housing and Urban Affairs / PIB

Official government release

Houses constructed and allotted for the poor in urban areas

Published: 2024-08-01

Publication checked: 2026-11-04

Value, period and coverage checked in publication

Metro-network length reported by government

Over 1,000 km

Historical reference

Status published 5 January 2025

India; network described in the PIB metro brief

A network-length stock measure.

Limitations: Definition and later revisions may differ from Metro/RRTS combined series. Not proof of affordable access or service frequency.

Press Information Bureau Research Unit / Ministry of Housing and Urban Affairs

Official government brief

1,000 Kms of Metro: 3 rd Largest in the World

Published: 2025-01-05

Publication checked: 2026-11-04

Value, period and coverage checked in publication

Cities covered by metro network in the government brief

23 cities

Historical reference

Status published 5 January 2025

India; metro cities counted in the same brief

City coverage, not coverage of every neighbourhood.

Limitations: Does not quantify station access, ridership, interchange quality or accessibility.

Press Information Bureau Research Unit / Ministry of Housing and Urban Affairs

Official government brief

1,000 Kms of Metro: 3 rd Largest in the World

Published: 2025-01-05

Publication checked: 2026-11-04

Value, period and coverage checked in publication

Urban municipal waste reported as processed

130,484 of 162,468 tonnes/day (80.31%)

Reported value — scope clarification required

Status reported 11 December 2025; exact observation cut-off not stated

Urban India; States/UTs reporting through Swachhattam

Daily processed quantity and its reported share.

Limitations: Administrative reporting; processing does not by itself establish safe outputs, segregation quality or environmental compliance.

Ministry of Housing and Urban Affairs / PIB

Official government release

Implementation of Swachh Bharat Mission – Urban

Published: 2025-12-11

Publication checked: 2026-11-04

Period / coverage needs clarification

Large legacy dumpsites reported fully remediated

1,096 of 2,478 identified sites

Reported value — scope clarification required

Status reported 11 December 2025; exact observation cut-off not stated

India; identified dumpsites containing more than 1,000 tonnes

Completed sites within this defined inventory.

Limitations: Excludes smaller sites from this inventory definition; count alone does not establish contamination removal or durable aftercare.

Ministry of Housing and Urban Affairs / PIB

Official government release

Implementation of Swachh Bharat Mission – Urban

Published: 2025-12-11

Publication checked: 2026-11-04

Period / coverage needs clarification

Smart Cities Mission projects reported completed

7,479 of 8,058 proposed projects

Historical reference

As at 13 January 2025

India; Smart Cities Mission project portfolio

Administrative delivery-stage count.

Limitations: Projects vary in scope and cost. Completion does not establish service quality, equitable benefit or maintainability.

Ministry of Finance / PIB

Official government release

Economic Survey 2024-25: infrastructure-sector summary

Published: 2025-01-31

Publication checked: 2026-11-04

Value, period and coverage checked in publication

Tap-water coverage reported under AMRUT

70%

Reported value — scope clarification required

Reported in Economic Survey 2024-25; exact observation date not stated in the linked summary

AMRUT mission coverage;500 focus cities described in the summary

Mission-area coverage reference.

Limitations: Not a national urban-household rate or a measure of water quality, pressure or continuity; consult underlying mission definitions.

Ministry of Finance / PIB

Official government release

Economic Survey 2024-25: infrastructure-sector summary

Published: 2025-01-31

Publication checked: 2026-11-04

Period / coverage needs clarification

Sewerage coverage reported under AMRUT

62%

Reported value — scope clarification required

Reported in Economic Survey 2024-25; exact observation date not stated in the linked summary

AMRUT mission coverage;500 focus cities described in the summary

Mission-area sewerage coverage reference.

Limitations: Not a national sewerage rate; coverage does not by itself establish treatment performance or environmental compliance.

Ministry of Finance / PIB

Official government release

Economic Survey 2024-25: infrastructure-sector summary

Published: 2025-01-31

Publication checked: 2026-11-04

Period / coverage needs clarification

Different surveys, administrative records, estimates and reporting years are not interchangeable. No combined IFT score is calculated from these rows.

Every available subject in this pillar

All 58 topics, organised here.

Read the topic names below and open the subject directly. The groupings are for navigation; each original topic remains separate.

People, access & capability (1)

IFT working ideas · Proposals for research

Practical ideas to investigate.

These are questions and proposals to develop, not completed programmes or established results.

Street-by-street utility coordination

Compare phased work on water, drainage, power and access to reduce repeated digging.

What must be checked

Plan service continuity and verify whole-life maintenance costs.

Housing access beyond the building

Study safe access to work, schools, care, transport and essential services around a housing proposal.

What must be checked

Compare household costs and displacement risks before selecting a design.

Neighbourhood infrastructure checks

Use a small set of verified failures and responsible maintenance routes to prioritise work.

What must be checked

Test completed repairs with residents and appropriate technical review.

Connected priorities.

10 questions and answers

Questions about Cities, Housing & Infrastructure

What makes housing affordable in this pillar?

Study rent or purchase cost together with utilities, maintenance, transport and access to jobs and services. A low advertised price does not describe the whole household burden.

Why connect utilities and street works?

Water, sewers, drainage, power, roads and access share space and dependencies. Coordinated plans and maintenance can be studied against repeated excavation and service disruption.

How should neighbourhood flooding be investigated?

Trace rainfall, catchments, drains, outlets, land use and maintenance. Check both the immediate blockage and the wider system before choosing a repair.

Why plan maintenance before construction?

A new asset needs staff, access, funds, spare parts and a repair process. The proposed review compares the cost and capability needed throughout its useful life.

How should accessibility shape a neighbourhood proposal?

Study complete routes to housing, work, school, care and public space. Include disabled people and others whose needs may be missed by a standard layout.

What should public-space projects measure?

Check who uses the place, when it is usable, safety, access and continuing maintenance. An opening ceremony or new surface alone does not show lasting value.

How should building safety be approached?

Identify the responsible owner and appropriate professional review, inspection and correction process. A website concept cannot certify a particular building as safe.

What should happen before a proposal affects homes or livelihoods?

Identify who may be displaced or lose access, examine alternatives and document safeguards and responsibilities. Do not treat a project boundary as proof that harm is acceptable.

How should infrastructure alternatives be compared?

Consider service need, land, environment, full-life cost and operating capacity. Compare repair, management changes and upgrades alongside new construction.

What shows a neighbourhood has improved?

Track reliable services, access, safety, household cost and maintenance outcomes over time. Compare results across residents rather than relying only on a citywide average.