Section 01
Where the problem happens
Define the service failure before selecting infrastructure.
Field application efficiency may not reduce basin consumption if area or pumping expands.
Crop and market incentives can overwhelm technology savings.
Required local context
Record state, district, city/block, village/ward or supply zone; season and date; source or asset; affected users; observed service; measurement or sample method; photo/document where safe; and uncertainty. Never imply 100-metre accuracy unless the evidence genuinely supports it.
Data reference table
Evidence Snapshot
Read each value with its reporting period, population and limitations. A historical national reference is not a local baseline or proof that an IFT proposal works.
5 measurement records still need data and a review of their relevance.
| Signal | Reference Value | Period / Population | How to Read It | Source Status |
|---|---|---|---|---|
| Water consumed per output/value | Not established Data required — not zero | Reporting period: Information Required Population and geography: Information Required | Proposed measure; no observed value is established here. Limitations: Define the measure, unit, reporting period and covered population; obtain a traceable dataset and review its suitability for this topic before using a number. | Source organisation: Information Required Direct source URL: not yet verified Source publication date: not established Verification status: Data required |
| Groundwater trend | Not established Data required — not zero | Reporting period: Information Required Population and geography: Information Required | Proposed measure; no observed value is established here. Limitations: Define the measure, unit, reporting period and covered population; obtain a traceable dataset and review its suitability for this topic before using a number. | Source organisation: Information Required Direct source URL: not yet verified Source publication date: not established Verification status: Data required |
| Yield/income stability | Not established Data required — not zero | Reporting period: Information Required Population and geography: Information Required | Proposed measure; no observed value is established here. Limitations: Define the measure, unit, reporting period and covered population; obtain a traceable dataset and review its suitability for this topic before using a number. | Source organisation: Information Required Direct source URL: not yet verified Source publication date: not established Verification status: Data required |
| System uptime | Not established Data required — not zero | Reporting period: Information Required Population and geography: Information Required | Proposed measure; no observed value is established here. Limitations: Define the measure, unit, reporting period and covered population; obtain a traceable dataset and review its suitability for this topic before using a number. | Source organisation: Information Required Direct source URL: not yet verified Source publication date: not established Verification status: Data required |
| Reuse compliance | Not established Data required — not zero | Reporting period: Information Required Population and geography: Information Required | Proposed measure; no observed value is established here. Limitations: Define the measure, unit, reporting period and covered population; obtain a traceable dataset and review its suitability for this topic before using a number. | Source organisation: Information Required Direct source URL: not yet verified Source publication date: not established Verification status: Data required |
Different surveys, administrative records, estimates and reporting years are not interchangeable. No combined IFT score is calculated from these rows.
Evidence coverage and review log (CSV) · Structured evidence register (JSON)
Section 02
Why the problem happens
Test the full source-to-service chain.
Equipment-first programmes
Treat this as a hypothesis until records, field observation, seasonal evidence and credible alternatives are checked.
No aquifer or watershed budget
Treat this as a hypothesis until records, field observation, seasonal evidence and credible alternatives are checked.
Operation and repair gaps
Treat this as a hypothesis until records, field observation, seasonal evidence and credible alternatives are checked.
Water-intensive market signals
Treat this as a hypothesis until records, field observation, seasonal evidence and credible alternatives are checked.
Section 03
How the parts work together
Components that must work together.
Drip and sprinkler where suitable
Define the responsible actor, operating standard, input, handoff, maintenance requirement, failure trigger and evidence record.
Soil-moisture and scheduling
Crop-water planning
Rain capture
Groundwater budgets
Safe treated-water reuse
Section 04
A solution suited to India
Match intervention to hydrogeology, settlement and service capacity.
Account for consumptive use and return flows.
Combine crop portfolio, timing, soil and delivery choices.
Use shared monitoring and farmer economics.
Tie reuse to quality and worker/crop safeguards.
Decision checks
Safety; Water balance; Affordability; Equity; Operations; Ecology; Climate risk; Accountability
Section 05
Roadmap
Diagnose, protect, pilot, measure and institutionalise.
- 0–90 DAYS
- Verify & protect
Confirm the location, affected users, service chain, immediate health or safety risk, responsible agency and existing evidence.
- 3–18 MONTHS
- Controlled pilot
Measure extraction, consumption, output and income in one crop-water system before and after intervention.
- 1–5+ YEARS
- Durable system
Fund operations, preventive maintenance, skilled teams, monitoring, public reporting, correction pathways and independent evaluation.
Section 06
Results
Measure service and outcomes—not assets alone.
KPI 01
Water consumed per output/value
Baseline · target · actual · unit · source · period · distribution
KPI 02
Groundwater trend
Baseline · target · actual · unit · source · period · distribution
KPI 03
Yield/income stability
Baseline · target · actual · unit · source · period · distribution
KPI 04
System uptime
Baseline · target · actual · unit · source · period · distribution
KPI 05
Reuse compliance
Baseline · target · actual · unit · source · period · distribution
Section 07
Risks and protections
Water interventions can transfer risk across people, places and time.
- Risk: Rebound use
Prevention · accountable owner · trigger · remedy - Risk: Farmer debt
Prevention · accountable owner · trigger · remedy - Risk: Unsafe wastewater exposure
Prevention · accountable owner · trigger · remedy
